top of page

The Kitchen Refurb

Client review : "The Zeke team completly stripped out the old kitchen. Levelled floor and installed new flooring. New kitchen installed together with associated carpentry, tiling, plumbing work, plastering and painting. Plus new electrical wiring and fuse box. I am very satisfied, all the work was done to a high standard. Kitchen looks very good and works well."

The Kitchen refurb

Royal Military - Bespoke Tower clock door

The clock tower access door severely rotten ( as can be seen in the first image to pieces,replaced by a needed long lasting design.

Royal ⚔ Military

Bathroom & Shower room restored
Leakage damaged

Bathroom & Shower room restored

Cause : defective shower valve.

Chelsea Barracks
Chealsea Barracks
 

Works carried on a Historical Building.

White Structure

Contact Us

+44 7743570481

Thanks for submitting!

Contact
    bottom of page